Do I need planning permission for solar panels in the UK?
1 June 2024
5 min read
CRG Direct Team

Do I need planning permission for solar panels in the UK?

You won't need planning permission unless you want to install a very large system or a system on a listed building. Learn about the rules and exceptions.

Do I need planning permission for solar panels in the UK?

You won't need planning permission unless you want to install a very large system or a system on a listed building. For most UK homeowners, solar panels fall under 'permitted development rights', making the installation process straightforward.

Permitted Development Rights

What Are They?

Permitted development rights allow certain building works and changes to be carried out without needing to apply for planning permission. Solar panels have been included in these rights since 2008, significantly simplifying the installation process.

Standard Requirements

Your solar installation qualifies for permitted development if:

  • Panels don't protrude more than 200mm from the roof
  • Installation doesn't exceed the highest part of the roof
  • Panels are removed when no longer needed
  • System is installed to minimise visual impact

When You DO Need Planning Permission

Listed Buildings

If your property is:

  • Grade I listed: Always requires permission
  • Grade II listed*: Always requires permission
  • Grade II listed: Usually requires permission
  • In a conservation area: May need permission for visible installations

Flat Roof Installations

Additional rules apply:

  • Panels must be at least 1 metre from the edge
  • Height must not exceed 1 metre above the flat roof
  • Total equipment must not exceed 50% of roof area

Ground-Mounted Systems

Planning permission is needed if:

  • System exceeds 9 square metres in area
  • Any dimension is greater than 4 metres
  • Installation is within 5 metres of property boundary
  • Height exceeds 4 metres

Commercial Properties

Different rules apply to:

  • Business premises
  • Agricultural buildings
  • Community buildings
  • Multiple installations on one site

The Planning Application Process

If Permission Is Required

The process involves:

  1. Pre-application advice (optional but recommended)
  2. Completing application forms
  3. Submitting required documents
  4. Paying application fee (typically £206)
  5. 8-week decision period

Required Documentation

  • Completed application form
  • Location plan (1:1250 scale)
  • Site plan (1:500 scale)
  • Elevation drawings
  • Design and access statement
  • Heritage statement (if applicable)

Conservation Areas and National Parks

Special Considerations

In these areas:

  • Panels must not be visible from highways
  • Stricter aesthetic requirements apply
  • Local planning authority has more discretion
  • Pre-application advice strongly recommended

World Heritage Sites

Even stricter rules apply:

  • Individual assessment required
  • Visual impact studies may be needed
  • English Heritage consultation likely
  • Alternative solutions may be suggested

Building Regulations

Separate from Planning

Even without planning permission, you must comply with:

  • Structural safety: Roof can support panels
  • Electrical safety: Part P regulations
  • Weather resistance: Proper sealing
  • Fire safety: Appropriate materials

MCS Certification

Using an MCS-certified installer ensures:

  • Compliance with building regulations
  • Proper notification to authorities
  • Valid warranties
  • Access to SEG payments

Common Misconceptions

"My Neighbour Complained"

  • Permitted development rights aren't affected by objections
  • Only relevant if planning permission required
  • Good practice to inform neighbours anyway

"I Need Permission for Battery Storage"

  • Internal battery storage doesn't need permission
  • External installations may need consideration
  • Usually falls under permitted development

"Panels Must Face South"

  • No planning requirement for orientation
  • East/west facing panels also permitted
  • Performance considerations separate from planning

Tips for Smooth Installation

Do Your Research

  • Check your property's designation
  • Review local planning policies
  • Consult your installer's experience
  • Consider pre-application advice

Documentation

  • Keep all certificates and permissions
  • Photo document the installation
  • Maintain installer correspondence
  • Store for future property sales

Good Practice

  • Inform neighbours of plans
  • Choose appropriate panel colours
  • Minimise visual impact
  • Consider community opinions

Regional Variations

Scotland

Slightly different rules:

  • More generous size allowances
  • Different listed building approach
  • Separate application process

Wales

Similar to England but:

  • Welsh language documentation available
  • Different fee structure
  • Local variation possible

Northern Ireland

Separate system entirely:

  • Different permitted development rights
  • Usually more restrictive
  • Check with local council

Future Changes

Potential Relaxations

Government considering:

  • Increased size allowances
  • Simplified conservation area rules
  • Streamlined application process
  • Reduced fees for renewables

Technology Advances

New products may affect rules:

  • Building-integrated PV
  • Solar tiles and slates
  • Transparent panels
  • Flexible installations

What If I Install Without Permission?

Enforcement Risk

Local authorities can:

  • Issue enforcement notices
  • Require system removal
  • Impose fines
  • Pursue prosecution

Regularisation

If discovered:

  • Apply retrospectively
  • May face additional scrutiny
  • Higher chance of refusal
  • Additional costs incurred

Professional Guidance

Your Installer Should

  • Advise on planning requirements
  • Have experience with applications
  • Provide necessary drawings
  • Support application process

CRG Direct Services

We offer:

  • Free planning assessment
  • Application support
  • Liaison with authorities
  • Experience with listed buildings

Conclusion

For most UK homeowners, planning permission isn't needed for solar panel installation. The permitted development rights make going solar straightforward. However, if your property has special designations or you're planning an unusual installation, it's worth checking requirements early.

Professional installers like CRG Direct will guide you through any planning requirements, ensuring your installation is compliant and hassle-free. Don't let planning concerns delay your solar journey - in most cases, you can proceed without any applications at all.

Ready for Renewable Energy?

Get your free energy assessment and discover how much you could save with solar panels, heat pumps, and battery storage.

Get Free Energy Assessment
Swipe to see more
MCS certification
NICEIC certification
Gas Safe certification
HIES certification
Which? certification
Octopus Energy certification
Swipe to see more
F-Gas certification
PAS 2030 certification
SMAS certification
IAA certification
Constructionline Gold certification

Need help with solar?

Chat with our AI assistant