Understanding the G98 and G99 Process: Registering Your Solar PV System with the National Grid

nstalling a solar photovoltaic (PV) system is an excellent way to save money on your energy bills. However, in order to ensure the safe and efficient integration of these systems into the existing electricity grid, a registration process known as G98 is required.

In this blog post, we will cover:

  • What the G98 and G99 processes are

  • Why you need a G98 or G99 when installing a solar system

  • How to know whether you need a G98 or G99

  • The steps involved, including how CRG Direct applies to the Distribution Network Operator (DNO) on your behalf

  • How long it takes to receive approval


What is the G98 Process?

In short, G98 is an approval process that certifies that your solar installation is approved by your local DNO (District Network Operator.)

  • A G98 makes your local energy grid aware that you have a solar installation.

  • The purpose is to ensure your solar system and others are safely added to the existing electrical infrastructure and grid. The process involves coordination between the installer, the national grid, and the DNO responsible for your area.

  • A G98 covers any solar installation with an inverter size of 3.6kw or less.

What is the G99 Process?

The G99 is an approval process that certifies that your solar installation is approved by your local DNO (District Network Operator) if you have an inverter size of more than 3.6kW.

How do you know whether you need a G98 or G99?

You need a G98 if you solar system has an inverter size of less than 3.6kW and a G99 if your inverter is larger than 3.6kW.

How do you apply for DNO approval?

Step 1: Application Submission

Once your solar panel installation is complete, our dedicated team will take the details of your installation and submit your G98 application to the national grid.

As part of our comprehensive service, CRG Direct handles the entire process on your behalf, making it hassle-free for you.

The application includes essential details about your system, such as its capacity, location, and relevant technical specifications.

Step 2: National Grid Registration

Upon receiving your application, the national grid will review the information provided and register your solar PV system.

Our team will ensure that all necessary documents and requirements are met, streamlining the registration process.

This step confirms that your installation complies with the technical and safety standards set by the industry and the grid operator.

Step 3: DNO Approval

Once we hear back from the DNO and have approval, we will send you your DNO/G98 certificate. This will be included in your handover pack.

Step 4: Timeframe and Considerations

It is important to note that the duration of the G98 process can vary. While the minimum time for DNO approval is typically three weeks, it can take up to 12 weeks or even longer in some cases. The exact time frame depends on various factors, including the workload of the DNO, the complexity of your system, and any additional requirements specific to your location. Our team will keep you updated throughout the process, providing transparency and support.

Please note that the wait time is out of our control, as we are dependent on hearing back from the DNO.

Conclusion:

The G98 process is a necessary step to ensure the smooth integration of solar PV systems into the national grid. By registering your system and obtaining DNO approval, you contribute to the stability and reliability of the electricity network. As part of our service, we take care of the entire process, including applying to the DNO on your behalf. We understand the importance of a hassle-free experience and aim to provide you with comprehensive support throughout the G98 process.

Get a free installation estimate

One of our expert team members will contact you to give you an estimate and answer any questions you may have.

Join the solar revolution and save up to 80% on your energy bill.

No obligation

MCS accredited

Your questions answered

Read our great reviews on Trustpilot

Dave Wood

We had a great experience with CRG…

“We had a great experience with CRG installing our solar panels and battery. Pre-install I had quite a few questions and they were always answered quickly and in an easy to understand way. During the installation the team discovered that it wasn’t going to be as straightforward as they initially thought due to the strange layout of our house and the location of the electrical fuse box etc but they did a great job of working out a route for the cabling that caused the least disruption. Since the install I’ve had another couple of questions about configuring the system and again, I got a quick and helpful response.”

Joyce Scott

A pleasure to deal with.

“From the initial survey till completion of the installation I have been most impressed. There was no hard sell, everything was explained clearly. Once I had accepted the lead date was just a matter of weeks. The actual installation was completed very efficiently. The backup support is second to none. l can't recommend Frank, Melissa and the team more highly for the whole experience.”

Paul Wickenden

Very impressed

“Frank came out to measure and quote for solar panels. He was professionally and quick with his quote. We did not feel rushed or pressured into purchasing at all.
Timescales were accurate and their communication was speedy and sincere.
Installation was brilliant. You could tell the installers knew exactly what they were doing.
Warning- The app to see your solar usage and generation is addictive!”